Pulau Bunting Bridge
Pulau Bunting Bridge
Gamuda Berhad undertook the design, construction and completion works for the 2.3km-long, 13m-wide sea crossing between Pulau Bunting and Kedah.
High-strength silica fume concrete was incorporated in the construction process to bring this visually arresting, and highly durable bridge to life.
High-strength silica fume concrete was incorporated in the construction process to bring this visually arresting, and highly durable bridge to life.
We undertook the design, construction and completion works for the 2.3km-long, 13m-wide sea crossing between Pulau Bunting and Kedah.
High-strength silica fume concrete was incorporated in the construction process to bring this visually arresting, and highly durable bridge to life.
Project Snapshots
1 / 6