Goulburn River Solar Farm

Project Snapshots
1 / 6
Goulburn River Solar Farm

Damansara-Puchong Highway (LDP)

Connecting two key satellite towns in the Klang Valley, Gamuda Berhad’s responsibilities in building the LDP included design, construction, testing, commissioning and maintenance works.

Spanning 40km, the highway has a total of 21 bridges and 19 interchanges.

Location

New South Wales, Australia

Project Awarded

December 2024

Biggest infrastructure project in Coffs Harbour’s history

DT Infrastructure was awarded an AUD625 million (approximately RM1.8 billion) contract from Lightsource bp Renewable Energy Investments Limited (Lightsource bp) to deliver the Goulburn River Solar Farm project in the Upper Hunter region of New South Wales (NSW), Australia.

The engineering, procurement and construction scope of works includes:

  • Civil, structural and electrical infrastructure required for the 585 MWp solar farm
A game-changer for renewable energy in NSW, the project is set to drive positive outcomes for the local community, bolstering the energy sector and advancing Australia’s carbon reduction targets.

Once operational, the solar farm will boast a 585 MWp capacity, generating enough renewable energy to power approximately 225,000 homes. The project is also expected to cut carbon emissions by 910,000 tonnes annually, contributing significantly to Australia’s sustainability goals and green energy transition.

Beyond delivering cleaner energy, the project will enhance economic opportunities for the region and fortify NSW’s electricity grid, underscoring its role in supporting the state’s energy transition.

Site access date for Goulburn River Solar Farm project is expected to commence by January 2025.

Project Snapshots
1 / 6